The project of renovation and expansion of the Ningdong-Yinchuan section of the Qingyin Expressway has been approved by the National Development and Reform Commission under the basis of Development and Reform [2014] No. 724. The project owner is the Ningxia Highway Construction Administration Bureau, and the construction funds have been allocated from the national special center. The construction fund and Ningxia Autonomous Region arranged financial funds and domestic bank loans. The proportion of project funding was 16.6%, 11.3%, and 72.1%, and the bidder was 27.9%. The project has already met the conditions for tendering. The project is now undergoing public bidding for the greening project.
Second, the project name, profile and scope of tender
2.1 Project Overview:
Qingyin Expressway, as the 5th of the “18 horizontal lines†of the National Expressway Network, connects Shandong, Hebei, Shaanxi, and Ningxia with a total length of 1610km, and is an important major channel for Ningxia to reach East China. The Qingyin Expressway starts in Wangquanliang of Yanchi County within the territory of Ningxia, and ends at Yinchuan City and is 141km long. The Ningdong-Yinchuan section (about 70.980km long) of the Qingyin Expressway is the main transportation channel between Yinchuan, Ningdong Energy and Chemical Base, Yinchuan Hedong Airport, Ningxia Airport Logistics Park, and Lingwu City and Yanchi County.
The project from the Ningdong to Yinchuan section of the Qingyin Expressway is a reconstruction and expansion project. The alignment of the route is completely coincident with the existing expressway, and basically becomes east-west direction. The route starts from the interchange of Gaoshawo Hub, which intersects with the planned Eastern Expressway, and is located near Hezhuangzi in Gaoshawo Town, Yanchi County, Wuzhong City. The starting point is K1442+000, which passes through Gaoshawo Town, Yanchi County, Wuzhong City in turn. The destinations of Ningdong, Linhe, Duzheng, and Daxin of Yinchuan City are located at the intersection of this project and Youai Center Road. The station is K1512+937.178 and the route is 70.980km long.
The main control points are: starting point Gaoshawo West, Wuhu, Guyaozi, Ningdongnan, Ningdong Junction, Shuidonggou, Shiba Hub, Yinchuan Yellow River Bridge, Yinchuan Mingcui Lake National Wetland Park, Yinchuan East Hub Interchange, The intersection of Qingyin Expressway and Youai Center Road.
The K1442+000 to K1499+200 segments of the project are to be rebuilt and expanded on an eight-lane expressway, with a design speed of 100km/h, an eight-car roadbed width of 42m, and a design speed of 60km/h for the directional or semi-directional ramp of the interchange hub. The design speed of the circular ramp is 40km/h. The unidirectional two-lane ramp with single-horn interchange design speed is 60km/h, the single-lane single-lane ramp design speed is 40km/h, and the annular ramp design speed is 40km/h. One-way single-lane road base width 8.5m, one-way two-lane road base width 10.5m or 12m, one-way three-lane road base width 14m, two-way three-lane road base width 19m or 20.5m.
2.2 Plan duration: March 20, 2017 - October 31, 2017, two years after the acceptance of the planting period.
2.3 Scope of Bidding: The scope of this tender is for greening and irrigation within 57.2 km of the renovation and expansion project of the Ningdong-Yinchuan section of the Qingyin Expressway (K1442+000-K1499+200). The project includes slopes and slope protection on both sides of the road. Roads, broken platforms, toll station greening and irrigation works, and central divider irrigation works.
2.4 Division of tenders: The bidding for the construction of this greening project is divided into two contract sections, and the specific contract sections are divided into:
No.
Contract section
From the end of the station
Mileage (Km)
Include content
1
Section 1 contract
K1442+000-K1471+625
29.625
Subgrade slopes, slope protection roads, broken platforms, toll stations (Gaoshawo West, Guyaozi) greening and irrigation works on both sides and central separation zone irrigation works
2
Section 2 contract
K1471+625- K1499+200
27.575
Subgrade slopes, slope protection roads, broken platforms, toll stations (Shuidonggou, Shiba) greening and irrigation works on both sides and central separation zone irrigation works
2.5 qualification examination methods: After the qualification examination.
2.6 Bid evaluation methods: reasonable low-cost method (double envelope form).
Third, bidder qualification requirements
3.1 The bid invitation requires the bidder to have: an independent legal person qualification, holds an effective business legal person business license issued by the administrative department for industry and commerce, and has the first class qualification for urban landscaping engineering issued by the competent construction authority, and within the next five years (2012 Since February of this year, the date of completion of the delivery certificate shall prevail. At least 2 green project construction contracts with a single contract amount of not less than 16 million yuan have been successfully completed, and the construction performance is based on the contract performance signed by the applicant and We have corresponding strengths in personnel equipment and capital.
3.2 The Commonwealth does not accept bids from the Consortium.
3.3 Each applicant of this tender can apply for up to 2 contract sections and apply for 1 contract section.
3.4 Affiliated companies that have an investment shareholding relationship, or parent companies that have direct management and managed relationships, or subsidiaries of the same parent company, or whose legal representative is the same person, and two or more legal persons may not bid on the contract segment at the same time. , otherwise it will be treated as scrapped. (The central enterprises directly under the supervision of the State-owned Assets Supervision and Administration Agency of the State Council do not belong to the "parent company" of this regulation. Their first-level subsidiaries may bid on the same bid at the same time, but the second-level subsidiaries that belong to the same subsidiary may not simultaneously The bid is bid.)
IV. Acquisition of Bidding Documents
4.1 Interested bidders are invited to participate in the bid from the time of publication of the announcement until February 20th, 2017 (registration can be registered on holidays or statutory public holidays)
Refillable E-cig
With the development of the times, the consumption level of people is gradually increasing. At the same time, people's entertainment methods are beginning to diversify, especially for modern young people. As a result, different kinds of electronic products are starting to be in people's lives, and the booming Electronic Cigarette industry reflects this.
Described including the upper shell, the upper shell at the top of the smoke outlet, as described in the bottom of the upper shell with airway, described with the smoke outlet in the airway and also to match the upper shell, the lower part of the shell described the airway in the direction of the lower shell extension, as described in the lower shell near one end of the upper shell is equipped with oil mouth, described the lower shell with batteries, described at the bottom of the bottom shell has come in The air port is provided with an oil storage bin in the lower shell, and the air passage passes through the oil storage bin and is provided with a heating atomization bin at one end away from the smoke outlet. The utility model has beneficial effects: it can meet the smoking habit of different users, avoid the premature end of the use experience caused by excessive consumption of smoke oil, and indirectly prolong the service time and life of the product.
Refillable E-Cig Oem,Refillable Vape Pod,Refillable Vape Pen Oem,Refillable Mod Oem
Shenzhen MASON VAP Technology Co., Ltd. , https://www.disposablevapepenfactory.com