Guangdong Power Grid Co., Ltd. Maoming 110kv Yuling Power Transmission Project Construction Tender Notice

Guangdong Power Grid Co., Ltd. Maoming 110kv Yuling Power Transmission Project Construction Tender Notice

Announcement time: 2016-9-14



Tender conditions

The construction of Maoming 110kv Yuling Power Transmission and Transformation Project of Maoming City was approved by Maoming City Development and Reform Bureau with Maofa Industrial Development Co., Ltd. [2014] No. 6, and the project construction unit was Maoming Power Supply Bureau of Guangdong Power Grid Co., Ltd. The funds were its own funds and bank loans, and the bidder was Guangdong Power Grid Co., Ltd. The project has already met the conditions for bidding. The project is now undergoing open bidding.

2. Project overview and scope of tender

2.1 Construction Location: Maoming City

2.2 Scale of Construction: 1. In this period, a new 2×40 MVA main transformer will be built, with two outlets of 110 kV outlets, 20 outlets of 10 kV, 2 x (5010 kvar+2400 kvar) capacitors for reactive power compensation, and a 220 kV Fupingling station opposite side; 110kV Wenchongkou station protection renovation project.

2. 110kV Fupingling to Yuling Line Project: from Fupingling Station to Yuling Station, using the returned 110kV Fupingling to Acant Line, the length of the line is about 1×1.63km, and the new double-circuit line on the same tower About 2×1.73km (Saiyu Line); 110kV Wenchongkou to Yuling Line Project: from Wenchongkou Station to Yuling Station, using the returned 110kV Wenchong to the Acantuan Line to be about 1 × 2.62km, set up a 1×1.53km line with the Shuanghui section of the same tower on the Yuyu line. 3, supporting communications engineering. The detailed scale is based on the construction drawings.

2.3 Plan duration: 365 calendar days, scheduled start date: November 1, 2016, date of completion of the plan: October 31, 2017 (specific start-up report, completion report shall prevail).

2.4 Bidding scope: Construction, installation, commissioning, completion and handover testing of the project within the scope of the construction drawings, and all the work required for completing the project specified in the bidding documents (see the tender documents for details).

2.5 Division of tenders: This project is divided into 1 bid. (For details on the division of tenders, see the tender documents).

3. Bidder qualification requirements

(1) Qualifications for Grade A and above in general contracting for power engineering construction, or Class A and above qualifications for professional contracting for power transmission and transformation projects;

(2) Having "License for Installation (Repair, Trial) Power Facilities": Class 3 and above licenses for installation.

(3) The project manager (project leader) to be assigned requires that he has obtained a registered construction engineer certificate (level of mechanical and electrical speciality) of level 2 and above, and a project manager safe production assessment (type B), and applies for the bid. Unit registration. (Note: According to the Notice of the Guangdong Provincial Department of Housing and Urban-Rural Development “On the Clear Issues Concerning Issues Concerning the Registration and Practice of Secondary Architects Entering Guangdong Province” (Guangdong Construction Letter No. 〔2011〕 No. 218), qualification certificates for secondary construction engineers, The certificate of registration is valid only within the administrative area where it is located and may not be practiced across provinces;)

(4) It has an independent legal personality, holds a valid and valid business license of a corporate legal person, and the production safety license issued by the administrative competent department is within the validity period;

(5) Credit requirements: No violations of laws and regulations, the government where the project is located, China Southern Power Grid Co., Ltd., and Guangdong Power Grid Co., Ltd. are not subject to restricted bidding qualifications;

(6) The bidding IC card has been processed at the Guangzhou Public Resource Trading Center, and the project manager (project leader) intending to serve as the project must be the registered person in the company (IC card);

(7) Consortium bids are not accepted.

4. Acquisition of tender documents

4.1 Any interested bidder is invited to participate in the bid from September 15th, 2016 to September 22nd, 2016, from 9:30 a.m. to 11:00 p.m., 14:00 p.m. to 16:00 p.m. (Beijing time, Same as below
Contact: Qian Yong

Mobile:

phone

fax

E-mail:

In order to ensure that you can bid smoothly, please consult the bidding agency or the tenderer for detailed requirements for bidding before bidding or purchasing the bidding documents. The specific requirements and project conditions shall be interpreted by the bidding agency or the tenderee.


Posted on